A gateway to the future
Built on a long view of international and domestic connection.

Sân bay
The new aviation gateway of southern Vietnam — conceived as a new generation of infrastructure: large, intelligent, and built around a long view of Vietnam's international connections.
Photo: Aaron Mrvelj / Unsplash
| Airport codes | LTH / VVLT |
| Location | Long Thanh, Dong Nai |
| Distance | ~40 km from Ho Chi Minh City |
| Direction | Green • Intelligent • Large-scale |
A new generation of aviation infrastructure for the south. An emblem of Vietnam's future capacity to connect. An internationally minded gateway built on a long-term vision.
Long Thanh is not simply a new airport. It is a strategic piece of infrastructure, planned to widen the space for aviation in the south, relieve pressure on the existing system, and set a new standard of connection for passengers, freight and regional growth.
Built on a long view of international and domestic connection.
Intelligent, green and built at scale.
Tied to logistics, regional growth and new economic space.
The project is designed to ICAO category 4F.
Phase 1 was approved with a capacity of 25 million passengers a year.
The freight target for phase 1 is 1.2 million tonnes a year.
With every phase complete, the design capacity could reach 100 million passengers a year.
A new airport built to widen the capacity of the southern metropolitan region.
Relieving pressure: designed to support and supplement the existing system around Ho Chi Minh City.
International connection: a new gateway for international passengers and long-haul networks.
Built at scale: planned for very high capacity once every phase is complete.
Long Thanh is not only about passengers; it matters clearly for freight and for supply chains.
Freight: phase 1 is set at a capacity of 1.2 million tonnes a year.
Regional connection: it creates more room for air logistics to grow in the south.
The long view: tied to a future role as a centre of trade and transport.
Infrastructure whose effect reaches beyond aviation into the region's growth.
Strategic infrastructure: one of the largest projects in Vietnamese aviation.
New-generation thinking: described as green, intelligent and coherently planned.
A new emblem: it stands for a long-term ambition to connect and to engage with the world.
Phase 1 was approved with one runway, one passenger terminal and a full set of supporting facilities.
Construction formally began, marking the move from planning into building.
Work continued to accelerate, and the project came to be described as an emblem of a new phase of development.
The target for bringing phase 1 into commercial operation is widely cited as the first half or the middle of 2026.
The capacity vision is very large, with a maximum design scale of 100 million passengers and 5 million tonnes of freight a year.
More than a new airport, it is a statement about the scale, the vision and the long-term connecting capacity of Vietnam in the phase ahead.
The airport is referred to as LTH in IATA (under the shared city code SGN) and VVLT in ICAO.
The airport is at Long Thanh in Dong Nai province, about 40 km east of Ho Chi Minh City.
Phase 1 was approved with one runway and one passenger terminal, at a capacity of 25 million passengers and 1.2 million tonnes of freight a year.
Its role as the new gateway of the south, its very large long-term capacity, and its direction as green, intelligent infrastructure on an international scale.
The TripWise.vn team handles flights, hotels, visas and everything alongside them.